CIVION logo CIVIONCONSTRUCTION COMPANY LIMITED
CIVION Construction Company logo

CIVION Construction
Company Limited

Building Construction · Design · Consultancy · Renovation
Estimating · Ceiling · MEP · Aluminium Works — Across Myanmar

2025Incorporated — 16 December 2025
9Projects completed & ongoing, 2025–2026
4Core services
145007399DICA Registration No.

About CIVION

CIVION Construction Company Limited is a Myanmar construction company providing building design, construction and consultancy services. From our head office in Nay Pyi Taw and our Yangon office, we deliver reinforced concrete buildings, interior ceiling works, aluminium door & window installation, and quality assurance / quality control consultancy.

Our track record since 2025 includes housing and residential buildings in Yangon and Thanlyin, industrial fit-out works, and ceiling installation at Star City — each project run by our own teams for design, quantity surveying, purchasing and construction.

We work to a simple standard: safe sites, honest dealing, and buildings finished to specification and on programme.

Our Vision

“To be one of Myanmar’s most trusted construction companies — recognised for quality workmanship, integrity in every dealing, and buildings that serve their owners and communities for generations.”

Our Mission

“To deliver safe, high-quality and cost-effective construction works, completed on time and to specification, through skilled engineering, disciplined site management, and honest partnership with our clients.”

Core Values Quality Safety Integrity Teamwork Commitment

Our Services

Four services, delivered by our own in-house teams — from full building construction to specialist installation and independent quality consultancy.

01

Building Construction

Reinforced concrete (R.C. / R.C.C.) and steel structure building construction — from excavation and foundations through structure, brickwork, plastering and roofing to handover — built to drawing and specification with disciplined site management at every stage.

Housing Residential Buildings Commercial Buildings Steel Structure Buildings Warehouses
02

Ceiling Installation

Supply and installation of ceiling systems for residential towers, offices and industrial buildings — framing, board installation and coordination with above-ceiling services, finished clean and level, ready for painting and lighting.

03

Aluminium Door & Window Installation

QC-Qualified Installation Tested Before Handover

Supply and installation of aluminium doors, windows and glass partitions — measured, fitted and sealed for smooth operation, weather protection and a clean finished appearance. Every installation is carried out to a QC-qualified standard, and the finished work is tested and checked before handover — no door or window is handed over until it passes QC.

QC-Qualified Installation & Testing

  • Installed, aligned, sealed & adjusted to QC standard
  • Operation tested on every door and window
  • Alignment checked
  • Sealing & water-tightness checked
  • QC passed before handover
04

QA/QC Consultancy

Quality assurance and quality control consultancy for construction projects — method statements, inspection and test plans, stage-by-stage site inspection and documentation that keeps work verifiable against specification. All QC inspections are carried out against the ACI Code and the MNBC (Myanmar National Building Code), by qualified and experienced engineers, and documented systematically with inspection checklists and rectification record lists.

Code-Based QC Inspection & Records

  • QC inspection against the ACI Code & MNBC
  • Inspected by qualified, experienced engineers
  • Method statements & Inspection & Test Plans (ITP) prepared before work starts
  • Materials approved & tested before use
  • Hold-point inspections at every stage — including pre-pour checks before concreting
  • Inspection checklists used at every stage
  • Defects recorded in rectification record lists
  • Non-conformance reports raised, with corrective action taken
  • Defects rectified and re-checked before sign-off
  • Complete QA/QC documentation handed over at completion

Our Projects

Our track record for 2025–2026 — nine projects across Yangon, Thanlyin and Nay Pyi Taw. Tap any photo to view it full size.

Zabuthiri Toilet Partition Installation

Completed
Year: 2025 Location: Zabuthiri Township, Nay Pyi Taw Scope: Toilet cubicle partition and urinal divider installation

Supply and installation of a complete toilet cubicle partition system for a large washroom facility in Zabuthiri Township, Nay Pyi Taw — full-height cubicle partitions and urinal divider panels, fitted with stainless-steel hardware, aligned and adjusted for smooth door operation and a clean, uniform finish throughout. Completed and handed over.

East Dagon Industrial Zone Aluminium Works

Completed
Year: 2025 Location: East Dagon Industrial Zone, Yangon Scope: Aluminium window & glass installation

Supply and installation of aluminium windows and glazing for a steel-structure industrial building in East Dagon Industrial Zone — aluminium window frames, large fixed glass panels and sliding glass sections, measured and fitted to the steel frame openings, sealed and aligned for smooth operation, weather protection and a clean finished appearance throughout the building.

P Moe Ning Housing

Completed
Year: 2026 Location: Hlaing Tharyar, Yangon Scope: Two-storeyed R.C. building construction

Construction of a two-storeyed reinforced concrete building at P Moe Ning Housing, Hlaing Tharyar — structure and frame works carried through under our own site team.

Japan Road Aluminium & Ceiling Works

Completed
Year: 2026 Location: Japan Road, Mingaladon Township, Yangon Scope: Aluminium works & ceiling works

Aluminium and ceiling fitting works at a property on Japan Road, Mingaladon Township — supply and installation of large black-framed aluminium windows and full-height glass walls, aluminium doors, ceiling works, and aluminium kitchen and under-window cabinets, including a covered outdoor kitchen area enclosed in aluminium framing and glass. Every unit was measured and fitted on site for clean lines, smooth operation and a uniform dark-frame finish throughout.

Ngwe Pin Lae Industrial Zone

Completed
Year: 2026 Location: Ngwe Pin Lae Industrial Zone, Hlaing Tharyar, Yangon Scope: Aluminium door & window installation and ceiling installation

Interior fit-out works at Ngwe Pin Lae Industrial Zone — aluminium doors and windows, aluminium-framed glass partitions and internal windows, and frameless glass doors and partitions, together with suspended ceiling installation with panel lighting across corridors and open-plan work areas.

Aung Chan Thar Aluminium & Tempered Glass Works

Completed
Year: 2026 Location: Aung Chan Thar Ward, Thanlyin Scope: Aluminium work & tempered glass work

Supply and installation of aluminium windows and doors and frameless tempered-glass balcony balustrades for a modern multi-storey residence in Aung Chan Thar Ward, Thanlyin — every unit measured, fitted and aligned on site for clean lines, secure fixing and a contemporary finish throughout. Completed and handed over in 2026.

AD Point Entrance Façade — Composite Panel Works

Completed
Year: 2026 Location: AD Point, Pyay Road, Hlaing Township, Yangon Scope: Aluminium composite panel (ACP) cladding — entrance façade

Design, supply and installation of aluminium composite panel (ACP) cladding for a grand entrance façade at AD Point on Pyay Road, Hlaing Township — a rose-gold, copper-finish ACP entrance portal with decorative diamond cut-out panels and a diamond-lattice pointed-arch feature screen, integrated with the full-height glass curtain wall and entrance steps behind it. The scope included the supporting framing, fixing, joint sealing and finishing, with every panel fabricated and installed to line and level and QC-checked before handover. Completed in 2026.

Star City — Galaxy Tower 3

Ongoing
Year: 2026 Location: Star City, Thanlyin Scope: Ceiling installation

Ceiling installation at Galaxy Tower 3, Star City, Thanlyin — ceiling framing, board installation and coordination with above-ceiling services.

North Okkalapa Residence

Ongoing
Year: 2026 Location: North Okkalapa, Yangon Scope: 3.5-storeyed R.C.C. building construction

A 3.5-storeyed reinforced concrete (R.C.C.) residential building in North Okkalapa, Yangon, being constructed by CIVION on a full-scope basis — from foundation and substructure works through the R.C. frame, brickwork and plastering to all finishing works, final completion and handover. The latest site photos show the scaffolded facade with brickwork and plastering now in progress on the upper floors.

Leadership

The board of CIVION Construction Company Limited.

Chief Executive Officer

U Zaw Myo Htet

Head of the company
Director

U Saw Yan Naing

Design Team & QS Team
Director

U Kyaw Kyaw Myo

Purchasing Team
Director

U Soe Min Phyo

Construction Team

Contact Us

For building construction, ceiling and aluminium works, or QA/QC consultancy — call or email us.

Offices

Head Office — Nay Pyi Taw
4th Street, No. (3) Ward, Aye Lar,
Lewe Township, Nay Pyi Taw
Yangon Office
No. 76-B, Thapyay Street,
Mingaladon Township, Yangon

Thank You for Visiting

We appreciate your time and interest in CIVION Construction Company Limited. For your next project, please feel free to contact us — we would be glad to build with you.