Our Projects
Our track record for 2025–2026 — nine projects across Yangon, Thanlyin and Nay Pyi Taw. Tap any photo to view it full size.
Zabuthiri Toilet Partition Installation
Completed
Year: 2025
Location: Zabuthiri Township, Nay Pyi Taw
Scope: Toilet cubicle partition and urinal divider installation
Supply and installation of a complete toilet cubicle partition system for a large washroom facility in Zabuthiri Township, Nay Pyi Taw — full-height cubicle partitions and urinal divider panels, fitted with stainless-steel hardware, aligned and adjusted for smooth door operation and a clean, uniform finish throughout. Completed and handed over.
East Dagon Industrial Zone Aluminium Works
Completed
Year: 2025
Location: East Dagon Industrial Zone, Yangon
Scope: Aluminium window & glass installation
Supply and installation of aluminium windows and glazing for a steel-structure industrial building in East Dagon Industrial Zone — aluminium window frames, large fixed glass panels and sliding glass sections, measured and fitted to the steel frame openings, sealed and aligned for smooth operation, weather protection and a clean finished appearance throughout the building.
P Moe Ning Housing
Completed
Year: 2026
Location: Hlaing Tharyar, Yangon
Scope: Two-storeyed R.C. building construction
Construction of a two-storeyed reinforced concrete building at P Moe Ning Housing, Hlaing Tharyar — structure and frame works carried through under our own site team.
Japan Road Aluminium & Ceiling Works
Completed
Year: 2026
Location: Japan Road, Mingaladon Township, Yangon
Scope: Aluminium works & ceiling works
Aluminium and ceiling fitting works at a property on Japan Road, Mingaladon Township — supply and installation of large black-framed aluminium windows and full-height glass walls, aluminium doors, ceiling works, and aluminium kitchen and under-window cabinets, including a covered outdoor kitchen area enclosed in aluminium framing and glass. Every unit was measured and fitted on site for clean lines, smooth operation and a uniform dark-frame finish throughout.
Ngwe Pin Lae Industrial Zone
Completed
Year: 2026
Location: Ngwe Pin Lae Industrial Zone, Hlaing Tharyar, Yangon
Scope: Aluminium door & window installation and ceiling installation
Interior fit-out works at Ngwe Pin Lae Industrial Zone — aluminium doors and windows, aluminium-framed glass partitions and internal windows, and frameless glass doors and partitions, together with suspended ceiling installation with panel lighting across corridors and open-plan work areas.
Aung Chan Thar Aluminium & Tempered Glass Works
Completed
Year: 2026
Location: Aung Chan Thar Ward, Thanlyin
Scope: Aluminium work & tempered glass work
Supply and installation of aluminium windows and doors and frameless tempered-glass balcony balustrades for a modern multi-storey residence in Aung Chan Thar Ward, Thanlyin — every unit measured, fitted and aligned on site for clean lines, secure fixing and a contemporary finish throughout. Completed and handed over in 2026.
AD Point Entrance Façade — Composite Panel Works
Completed
Year: 2026
Location: AD Point, Pyay Road, Hlaing Township, Yangon
Scope: Aluminium composite panel (ACP) cladding — entrance façade
Design, supply and installation of aluminium composite panel (ACP) cladding for a grand entrance façade at AD Point on Pyay Road, Hlaing Township — a rose-gold, copper-finish ACP entrance portal with decorative diamond cut-out panels and a diamond-lattice pointed-arch feature screen, integrated with the full-height glass curtain wall and entrance steps behind it. The scope included the supporting framing, fixing, joint sealing and finishing, with every panel fabricated and installed to line and level and QC-checked before handover. Completed in 2026.
Star City — Galaxy Tower 3
Ongoing
Year: 2026
Location: Star City, Thanlyin
Scope: Ceiling installation
Ceiling installation at Galaxy Tower 3, Star City, Thanlyin — ceiling framing, board installation and coordination with above-ceiling services.
North Okkalapa Residence
Ongoing
Year: 2026
Location: North Okkalapa, Yangon
Scope: 3.5-storeyed R.C.C. building construction
A 3.5-storeyed reinforced concrete (R.C.C.) residential building in North Okkalapa, Yangon, being constructed by CIVION on a full-scope basis — from foundation and substructure works through the R.C. frame, brickwork and plastering to all finishing works, final completion and handover. The latest site photos show the scaffolded facade with brickwork and plastering now in progress on the upper floors.